O
PERATION
Note
Depending on load, this may be
between 2 to 3 on the speed control
scale.
12
5.
Set the timer for the desired time period (up to one
hour) or turn counterclockwise to CONSTANT posi-
tion for continuous shaking.
6.
In order to overcome initial inertia of the load, turn
the speed control to point where shaking just starts.
7.
Gradually increase shaking speed to the desired
level being careful to observe that containers and
contents remain secure. If any danger is inherent in
work being carried out, proper shielding should be in
place or work should be conducted in well-ventilated
laboratory hood.
In Case of Electrical Overload
The unit is protected against electrical overload by pushbut-
ton, re-settable circuit breaker(s). If an overload occurs, the
breaker(s) will trip.
To re-set the circuit breaker(s), unplug the unit and push the
button in. However, if the breaker(s) trip repeatedly, unplug
the unit and have the shaker serviced.