Nortel Passport 15000 Preparation Manual page 12

Hide thumbs Also See for Passport 15000:
Table of Contents

Advertisement

12 Contents
241-1501-205 5.2S2
List of figures
Figure 1
Task flow of planning considerations 30
Figure 2
Task flow of cable management assessment 36
Figure 3
A dual-drawer fiber management unit 45
Figure 4
Airflow directions of upper and lower cooling units in an
NTRU04 57
Figure 5
Clearance to swing a door open on a NEBS 2000
frame 73
Figure 6
A shelf assembly in a rack, isometric front view 90
Figure 7
Task flow of site preparation 95
Figure 8
NEBS 2000 footprint measurements 98
Figure 9
Task flow of preparing the floor for anchor holes 102
Figure 10
Anchoring to a raised floor with removable tiles 108
Figure 11
Drilling a raised floor without removable tiles 109
Figure 12
Anchor in a concrete floor 110
Figure 13
MFA150 power system of five rectifiers for two
Passport 15000 or 20000 shelves 124
Figure 14
Grounding an NTRU04 frame to a ground window 140
Figure 15
Polyvalent power-and-ground assembly
A0834143 149
Figure 16
ETSI power-and-ground assembly A0834149 151
Figure 17
IBN grounding 154
Figure 18
CBN grounding 155
Figure 19
Mesh-BN bonding network 166
Figure 20
Mesh-IBN isolated bonding network 167
Figure 21
Star-IBN isolated bonding network 168

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passport 20000

Table of Contents