Nortel Passport 15000 Preparation Manual page 103

Hide thumbs Also See for Passport 15000:
Table of Contents

Advertisement

Task flow navigation
The following references are listed alphabetically:
"Checking the floor" (page 104)
"Common procedure used for drilling any floor" (page 105)
"When adding a door to a NEBS 2000 frame" (page 111)
"When adding a door to a NEBS 2000 frame" (page 111)
"Marking the footprint and the anchor holes on the floor" (page 112)
"When anchoring NEBS 2000 frames side-by-side" (page 116)
"When anchoring ac rectifiers near a Passport" (page 118)
Passport 15000, 20000 Site Requirements and Preparation Guide
Chapter 3 Site preparation 103
5.2S2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passport 20000

Table of Contents