Raise/Lower Control Box - Furuno FSV-85-MARK-2 Installation Manual

Color scanning sonar
Hide thumbs Also See for FSV-85-MARK-2:
Table of Contents

Advertisement

2. WIRING
2.6

Raise/Lower Control Box

Connect the 3 phase power cable and the transceiver unit cables
(10CA10053 - marked with "Control Unit") as shown below.
Confirm that the LED lights in red after the wiring is completed. If the LED does not
light, turn off power from the mains switchboard, disconnect then reconnect the power
cables, turn on the power, and check if the LED lights.
The hull unit does not work when the connection is wrong.
Normal phase: LED lights in red.
Phase reversal: LED does not light.
Fabricate the power cable as shown below.
Cut the outer sheath and
armor at the same location.
2-16
TB-C101
U V W
Three phase AC
Anti-corrosive
sheath
30 mm
30 mm
Seal cut ends with insulated tape.
J2
Connect the transceiver
cables (10CA10053) here.
LED for phase
revesal
200 mm
200 mm
Crimp-on lug
Cores
FV2-4 (2 pcs.)
Use clamps to secure
the vinyl sheath.