Furuno FSV-85-MARK-2 Installation Manual page 23

Color scanning sonar
Hide thumbs Also See for FSV-85-MARK-2:
Table of Contents

Advertisement

3. Attach a ground wire (IV-1.25sq, supplied locally) to the ground terminal at the
bottom of the unit, then connect the other end of the ground wire with the ship's
ground.
4. Secure the control unit the KB fixture, using four binding screws (M5×20, sup-
plied).
5. Attach four bolt hole caps (supplied).
1.3.3
Flush mounting
Note: Be sure the mounting surface is flat.
1. Referring to the outline drawing at the back of this manual, prepare a cutout, then
drill four pilot holes in the mounting location.
Ground screw*
*
: Use the screw that is preattached to the ground terminal.
Bolt hole cap
Binding screw
(M5×20, 4 pcs)
1. HOW TO INSTALL THE SYSTEM
Ground wire
(4 pcs)
1-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-85 mark-2Fsv-8422-mk2Fsv-8423-mk2

Table of Contents