ABB TPL65VA10 Operation Manual page 65

Table of Contents

Advertisement

NOTICE
© Copyright 2016 ABB. All rights reserved.
Maintenance
Cleaning the compressor during
operation
Screw in the sealing plug (X).
Push the valve activator (Y) against the spring and hold it for 10 to
15 seconds until the entire volume of water has been injected.
After cleaning, wait at least 5 minutes to allow the turbocharger to dry.
If the cleaning operation is not satisfactory, it may be repeated up to
two times.
If the cleaning results are still not satisfactory after three attempts and
the engine values are also unsatisfactory, we recommend that you have
the turbocharger inspected and cleaned by an official ABB Turbocharg-
ing Service Station.
Cleaning parameters per turbocharger compressor
Product
TPL65
Operation Manual / TPL65VA10 / VA30
5
5.3
Engine load
Contents of water vessel
50 ... 85%
Page 63
[dm
]
3
0.4

Advertisement

Table of Contents
loading

Table of Contents