Dunkirk GWB9-050IH-2 Installation Instructions Manual page 36

Gas-fired, direct vent, condensing, hot water boiler
Table of Contents

Advertisement

Casting Temperature Safety Switch
In event of lack of or loss of water in boiler, Casting
Temperature Safety Switch (300 °F setpoint) installed
on top of the aluminum boiler section shuts off boiler by
shutting off power to Integrated Boiler Control (IBC). This
fault requires manual reset of casting temperature safety
switch to restart the boiler. Verify that boiler is properly
fi lled with water before resetting this switch.
Never run cold water into a hot empty boiler.
Differential Pressure Air Proving Switch/Blocked
Vent Safety Shutoff
Differential pressure switch monitors air fl ow by sensing
differential pressure measured in inches of water (" w.c.).
Pressure switch contacts close when draft inducer is
running. Closed switch indicates there is adequate air fl ow
for combustion. Pressure switch shuts off main burner if
differential pressure is inadequate due to blocked vent pipe,
blocked air intake, blocked boiler sections, or blocked draft
inducer. If pressure switch contacts fail to close control will
display Error Code 29.
Draft Inducer
Draft inducer (blower) provides means for pulling
combustion air into and through the mixer, burner, fl ue
ways of cast aluminum boiler sections and fl ue adapter
before being discharged through vent piping to outdoors.
See applicable sections for proper sizing and installation of
combustion air and vent piping in this manual.
Circulator Pump
Every forced hot water system requires at least one
circulating pump.
Circulating pump imparts the necessary energy to move
water through closed loop supply and return piping
systems, terminal heating equipment (i.e. fi nned tube
radiators, etc.) and back through boiler for reheating.
To provide required hot water fl ow rates, circulator pump
must be properly sized to overcome frictional losses
(usually measured in feet of water, also referred to as
"pump head loss") of supply and return piping systems and
boiler.
The circulator pump is furnished for single zone or zone
valve controlled heating system and should be located on
downstream (i.e., pumping away) side of expansion tank.
For pump controlled system (where there is a circulator for
each zone) circulator provided with boiler can work for one
zone. For more details on piping and circulators, see "Near
Boiler Piping" on page 11 .
CONTROLS AND ACCESSORIES
Drain Valve
Manual drain valve provides means of draining water in
heating system, including boiler and hot water supply and
return piping systems installed above drain valve. This
drain valve is installed in ¾" tapping at bottom of front
boiler section. Any piping installed below elevation of
this drain valve will require additional drain valves to be
installed at low points in piping systems in order to drain
entire system.
A.S.M.E. Rated Pressure Relief Valve
Each boiler must have a properly sized and installed
American Society of Mechanical Engineers rated pressure
relief valve. Water expands as it is heated by burner/
boiler sections. If there is no place for water to expand
its volume, (i.e. a properly sized and properly functioning
expansion tank) pressure on inside of boiler and heating
system will increase. Furnished relief valve automatically
opens at 30 psig pressure to relieve strain on boiler and
heating system from increasing pressure. Pressure relief
valve discharge must be piped with piping same size as
valve discharge opening to open drain, tub or sink, or
other suitable drainage point not subject to freezing, in
accordance with A.S.M.E. specifi cations and requirements
of local jurisdiction.
External Condensate Pump (Optional)
For installations where there is no fl oor drain or other
appropriate drainage receptacle available to receive
condensate from the boiler, an external fl oat activated
condensate pump with integral sump is required. This unit
can be installed to pump the condensate to a remote tie in
point to a sanitary sewer system. For this application, the
boiler must be installed so that proper pitch of piping to the
external condensate reservoir (sump) can be accomplished.
Use wood frame or blocks to raise boiler as required for
proper installation.
36

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gwb9-075ih-2Gwb9-100ih-2

Table of Contents