Nvidia Spectrum SN2000 Hardware User Manual page 39

10/25/40/50/100gbe open ethernet switch systems
Table of Contents

Advertisement

2x Rack mount rails (A) 
2x Rack mount blades (B) 
2x Inner rails (C)
Rail-Kit Parts
   2xA                                2xB                            2xC
Prerequisites:
At least two people are required to safely mount the system in the rack.
All servers and systems in the rack should be planned with the same airflow direction.
All FRU components must have the same airflow direction. A mismatch in the airflow will
affect the heat dissipation.
The part of the system to which you choose to attach the rails will determine the system's
adjustable side. The system's part to which the brackets are attached will be adjacent to the
cabinet.
The FRU side is extractable. Mounting the rack brackets inverted to the FRU side will allow
you to slide the FRUs, in and out.
Installation
1.
Extract the inner rails (A) from the other rails by pressing the spring latch and pulling it out,
as shown in the following illustration:
2.
Mount the inner rails (A) onto the chassis:
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn2700Sn2740Sn2410Sn2201Sn2100Sn2010

Table of Contents