Nvidia Spectrum SN2000 Hardware User Manual page 26

10/25/40/50/100gbe open ethernet switch systems
Table of Contents

Advertisement

In case there are cables that cannot bend within the rack, or in case more space is needed
for cable bending radius, it is possible to recess the connector side or the FRU side by 3" or
4" (7.62 or 10.16cm) by optional placement of the system's rails. 
The FRU side is extractable. Mounting the sliding rail inverted to the system will allow you to
slide the FRU side of the system, in and out. 
To mount the system into the rack:
1.
Insert 10 cage nuts into the desired slots of the rack: 4 cage nuts in the non-extractable side
and 6 cage nuts in the extractable side.
Installing the Cage Nuts
2.
Mount both of the outer rails (C+D) into the rack (as illustrated below), and use 8 standard
pan-head screws (E) to fix them to the rack. Do not tighten the screws yet.
Mounting the Outer Rails into the Rack
3.
If cable accommodation is required, route the power cable and/or Eth cable through either
of the outer rails. 
4.
Attach left and right inner rails (A+B) to the switch sides, by gently pushing the switch
chassis' pins through the slider key holes, until locking occurs. 
Attaching the Inner Rails
26

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn2700Sn2740Sn2410Sn2201Sn2100Sn2010

Table of Contents