Download Print this page

Window Installation - Tiger TIGERFLEX Elysia General Assembly Instructions

Apex log cabin

Advertisement

TIGERFLEX
APEX LOG CABIN GENERAL INSTRUCTIONS
®
Step 17:

WINDOW INSTALLATION

• Once external fascias have been fitted, offer window up to the opening as shown.
• Make sure window is positioned centrally, resting on the last full log within the opening.
NOTE: THERE WILL BE A GAP EITHER SIDE TO ALLOW FOR MOVEMENT OF LOGS.
• Secure the window to the walls using 7x S35 evenly spaced.
• Internal fascias can be installed at this point. These are fixed to the window frames only.
NOTE: DO NOT ATTACH TO THE LOGS.
S35
S35
S35
24
tigersheds.com
0113 205 4189
(See Step 14 &15 For Reference)
S35
sales@tigersheds.com
S35
S35
S35

Advertisement

loading

This manual is also suitable for:

Tigerflex copiaTigerflex zoraTigerflex nova