Isuzu AA-6HK1T Workshop Manual page 234

Industrial diesel engine
Table of Contents

Advertisement

Service Precaution . . . . . . . . . . . . . . . . . . . . . . . . . 6J-1
Turbocharger. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6J-2
General Description . . . . . . . . . . . . . . . . . . . . . . . 6J-2
Service precaution
• Be sure to use the correct fastener in the proper
location. If a used fastener is replaced with a new
one, the new fastener must be identical to the
previous one.
• Some fasteners must always be replaced with
new ones following removal. These fasteners are
specified in this Manual.
• Some fasteners require thread locker or thread
sealant. These fasteners are specified in this
Manual.
• Supplemental fastener coatings (paint, grease, or
corrosion inhibitor) affect fastener torque and
clamping force. They may damage the fastener.
Do not use them unless specifically called for.
• Tighten all fasteners to the specified torque. If
there is a tightening sequence, follow it exactly.
ENGINE INDUCTION
CONTENTS
ENGINE INDUCTION
Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . 6J-4
Inspection and Repair . . . . . . . . . . . . . . . . . . . . . 6J-6
6J–1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bb-6hk1t

Table of Contents