6. Installing the Shelf Level Upstream Product
Unpacking Shelf Level Upstream Product
Make sure the framework has the space and the airflow to provide an acceptable operating
ronment for the CPS3200U shelf. Then unpack the equipment.
Step
Save the shipping package until all parts are operating within specifications. If the equipment must be
4.
turned, it should be repacked in the original shipping crate.
Installing and Powering the CP3200U Converter Shelf
Position the Shelf and mechanically attach it to the frame
Step
Locate the 2 mounting brackets, one on each side of the CPS3200U shelf; align the holes in the shelf mounting
bracket with the holes in the mounting frame. Attach the brackets to the frame using two screws per frame as
shown.
Page 23
© 2021 ABB. All rights reserved.
Action
Action
Figure 4 Mounting the Converter Shelf
envi-
re-