Viessmann B1KE Combi Series Installation And Service Instructions Manual page 88

Table of Contents

Advertisement

Troubleshooting
Fault Messages
Fault Messages
Repairs
(continued)
B1HE/KE 150/199
1. Remove the control unit.
2. Loosen the union nut on the gas pipe.
Note: Hold the union nut in place (with an open ended
wrench) to prevent damage to the gas pipe, use
the two handed method.
3. Remove the burner.
4. Pull off the clip and remove the flow switch.
5. Pull off the clips and remove the supply pipe toward
the front. When refitting the pipes new cable ties
must be used to secure the clips.
88
(continued)
(continued)
Vitodens 100-W, B1HE/B1KE Combi Installation/Service
6. Remove the screws on the hydraulic plate at the
bottom of the boiler.
7. Undo the union nut of the boiler pump.
8. Remove the hydraulic unit.
9. The hydraulic unit is installed in reverse order.
WARNING
Risk of electric shock from escaping heating water or
DHW. Check the dual sensor for leaks.
60 lb.ft
(80 Nm)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents