Fitting The Base Plate For The Ash Box; Fitting The Ash Box - Viessmann VITOLIGNO 300-C Installation And Service Instructions Manual

Table of Contents

Advertisement

Vitoligno 300-C Installation/Service

Fitting the Base Plate for the Ash Box

Fitting the Ash Box

Note: The base plate and a bag containing 3 nuts can be
found on top of the boiler.
1. Secure base plate to the boiler with 3 nuts.
2. Align base plate at right angles to the boiler with the
pre-installed adjustable feet.
Note: Before inserting the ash box, ensure the cover is
in place and locked with the tensioning toggles.
1. Pull locked release bolt B and pull ash partition A
forwards until the release bolt B engages.
2. Push back ash box C on base plate D along guide
rail E as far as it will go and push to engage ash
discharge auger pipe.
3. Secure ash box to the boiler with 2 latch clamps F.
Installation
35

Advertisement

Table of Contents
loading

Table of Contents