Calibrating The O 2 Probe; Filling The Vacuum Module; Ending Commissioning; Displaying The Menu Structure - Viessmann VITOLIGNO 300-C Installation And Service Instructions Manual

Table of Contents

Advertisement

Commissioning, Inspection and Maintenance
Calibrating the O

Filling the Vacuum Module

Ending Commissioning

Displaying the Menu Structure

Setting the Fuel Supply Times

Matching the Control Unit to the Heating System

68
Probe
2
(with vacuum system)
Vitoligno 300-C Installation/Service
Probe calibration must not be performed during
Note:
commissioning.
The probe calibration required when replacing the
Lambda probe can only be performed manually.
For calibrating the Lambda probe, see page 104.
Press the following keys:
1.
for "Yes"
|/~
"Manual" setting: not possible.
"Automatic" setting:
Suction turbine starts automatically after d is pressed.
Press the following keys:
1.
for "Yes/No"
|/~
If "Yes" is selected: The commissioning sequence
is concluded. The display changes to the standard
menu.
If "No" is selected: Commissioning restarts
2. d to confirm.
If you exit the commissioning sequence by pressing
"å", the structure of the commissioning menu is
displayed. From here, you can switch to the standard
menu by pressing ä.
You can individually select specific times during which
you do not want fuel to be supplied.
Refer to the Vitoligno 300-C Operating instructions.
The control unit must be matched to the system equipment
level. Various system components are recognized
automatically by the control unit and the relevant codes are
set automatically.
Check and adjust all addresses in Coding 1 (see chapter
"Coding 1").
Note: Further setting options are listed in Coding 2.