Shipping & Receiving; Receiving An Instrument; Returning An Instrument To The Factory - AML Oceanographic MVP-X User Manual

Table of Contents

Advertisement

Shipping & Receiving

Receiving an Instrument

When receiving an instrument, perform the following steps to ensure the instrument will be ready
for deployment when required:
 Inspect the shipping container, looking for signs of damage. Damage to the shipping
container could indicate damage to the instrument inside.
 The shipping package should include all of the following items
o MVP•X instrument
o Blue sensor box which includes:
 One primary sensor blanking plug
 Two secondary sensor blanking plugs
o USB stick with manuals and documentation
 Inspect for damage
o Check the cable for slices or gouges
o Check the connector sockets for corrosion, dirt, and salt deposits
o Check the pressure case for dents and scrapes
o Check the sensors for cracks or bends
 Ensure all the Xchange™ sensors are installed tightly. The blue locking sleeve should be
tight, and sitting less than 1 mm from the instrument end cap.
 Connect the instrument to a computer with the data cable and perform a scan or monitor if
using SeaCast.

Returning an Instrument to the Factory

 If shipping for repair or recalibration, obtain an RMA number from the service centre.
 Pack the instrument in its original shipping box to prevent damage during shipping.
An RMA number can be requested using the contact options given in the Support section of this
manual.
User Manual for AML Oceanographic's MVPX
4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MVP-X and is the answer not in the manual?

Table of Contents