Page 2
#70793 Forklift Pockets Hoisting Ring Safety Strap #13814 Loading The Juggernaut Cart RZ Bases should be centered and in alignment with the 3 hook points 3 Triangular Hook Points located on the side of the cart. Shown right. Quick Set Bases should be inter stacked, centered in the center of the cart.
Page 3
Loading The Juggernaut Cart With 2 workers place each guardrail in the slots provided between the post. Load all guardrails on the Juggernaut. Prior to transporting or hoisting the Juggernaut bases and guardrails must be secured with Pull Straps Secure bases with the pull strap by placing it over and in between the base guide post.
Caster Wheels Caster Wheels Juggernaut cart off the ground about two feet. The Juggernaut Cart is equipped with two sets of casters, rotating and fixed. Before assembling the casters to the Juggernaut make sure the rotating casters are on both positioned on the same short end of the cart.
Page 5
Do not attempt to relocate a fully assembled system. Continuous Guardrail Run If you have any questions call 800-241-1806 or 404-344-0000 or email: roofing@tiedown.com TIE DOWN Safety Products Division Page 5 of 8 800-241-1806 • 404-344-0000 • www.tiedown.com...
Page 6
2. Follow installation instructions supplied with the type fastener you are using. 4” Deep 6” Min. Single Screw Attachment Multi Screw Attachment Must be attached through Additional screws may be the center slot added for additional security TIE DOWN Safety Products Division Page 6 of 8 800-241-1806 • 404-344-0000 • www.tiedown.com...
Page 7
5. Zip base plates must be oriented correctly with the Universal Guardrails installed perpendicular. Toe boards are installed parallel to the guardrails. Safety clips pins must be inserted through all zip base plates and guardrails. TIE DOWN Safety Products Division Page 7 of 8...