Periodic Maintenance - Crown EMT-6 Installation & Operation Manual

Direct steam kettles
Hide thumbs Also See for EMT-6:
Table of Contents

Advertisement

Direct Steam Kettles Mounted on Electric Boiler Cabinet Base

Periodic Maintenance

P
M
ERIODIC
AINTENANCE
WARNING
Disconnect the unit from the power supply before cleaning or servicing appliance.
IMPORTANT INSTRUCTIONS
Be sure to flush your boiler water level control daily. Failure to follow this procedure can cause the control to malfunction
resulting in serious boiler damage.
The Boiler Water Level Control installed on your boiler requires periodic maintenance. As boiler water circulates into
the float chamber, sand, scale and other sediment may be deposited in the float chamber. While the chamber has been
designed with a large accumulation bowl, it is necessary to flush the sediment from the chamber by blowing down the
control so that the accumulation of sediment does not interfere with the movement of the float in the control.
Control must be flushed at least once a day.
CAUTION
Protect yourself. When flushing control, hot water and steam will flow out of the drain.
When flushing control, note water level in gauge glass, allow the boiler to fill if necessary and also to come up to temperature.
Before flushing control, note that water level in gauge glass is within operating range and the boiler pressure is at least
6 psi. While the boiler is being fired, open blowdown valve at bottom of control by rotating the handle counterclockwise
about 1/4 turn to fully open the valve
Opening the blowdown valve also checks the cut-off operation. Float should drop shutting burners off, hot water and
steam will flow out the drain flushing away sediment.
CAUTION
If heater does not shut off during blowdown, immediately discontinue use of appliance and call for service.
Continue draining water for about fifteen (15) seconds, from control until water is clean. Manually close valve. Recheck gauge
glass. If water level has dropped significantly, wait for the boiler to restore water level and pressure and repeat if necessary.
1. Observe that the water in gauge glass is clean and clear. Extreme murkiness in water indicates inadequate water quality.
2. Safety valve should be tripped during operation once a week to assure that it functions properly.
3. Keep all exposed cleanable areas of unit clean at all times.
INSTALLATION & OPERATION MANUAL 10071 REV 4 (07/22)
13
PAGE
OF 20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emt-10Emt-12Emt-6-6Emt-10-6Emt-10-10

Table of Contents