Electrical Diagram - York YVAG012 Operation & Maintenance Manual

Dc inverter air-cooled chiller and heat pump
Table of Contents

Advertisement

ELECTRICAL DIAGRAM

All electrical wiring should be carried out in accordance with local regulations. Route properly sized cables to the
cable entries in the side of the unit.
It is the responsibility of the user to install over current protection devices between the supply conductors and the
power supply terminals on the unit.
Wire Controller Installation
STEP 1: Wiring
Wire
Controller
Notes:
1.
Total length of communication and power supply line should be within 15m.
2.
A, B, 12V, and 0V should be connected correspondingly in case of malfunction or controller damage.
STEP 2: Panel Disassembly
Front panel of controller
Notes: As printed circuit board is on the front panel of controller, be cautious when using flat-head screwdriver.
JOHNSON CONTROLS
Cooke Industries - Phone: +64 9 579 2185
FIGURE 24 – WIRE CONTROLLER CONNECT TO UNIT
Insert and turn flat-head screwdriver slightly and separate the front and
FIGURE 25 – WIRE CONTROLLER STRUCTURE
Email: sales@cookeindustries.co.nz
FORM NO.: 6U5M-A11M-NB-EN
Back panel of controller
back panels.
Web: www.cookeindustries.co.nz
1# Modular
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yvag018Yvag020Yvag033Yvag040

Table of Contents