Inspection Checklist; Handling - York YVAG012 Operation & Maintenance Manual

Dc inverter air-cooled chiller and heat pump
Table of Contents

Advertisement

TABLE 2 – PRODUCT WEIGHT
Unit/Parameters
Gross weight
Operating weight
Schematic Diagram of Hoisting with Packaging
With a wooden cork base
Center of gravity of the unit inclined to one
side, please hoisting according to the above
picture and the requirements of installation
manual. Please refer to the parameter list for
the weight of the unit.
To ensure warranty coverage, this equipment must be commissioned and serviced by an
authorized YORK service mechanic or a qualified service person experienced in unit installation.
Installation must comply with all applicable codes, particularly in regard to electrical wiring and
other safety elements such as HP cutout settings, design working pressures, and ventilation
requirements consistent with the amount and type of refrigerant charge.
Lethal voltages exist within the
switches.

INSPECTION CHECKLIST

The following items, 1 through 4, must be checked
before placing the units in operation.
1.
The nameplate content of the unit is identical with
the order;
2.
The accompanying documents of the unit are
complete;
3.
The accessories of the unit are in accordance with
the items listed in the packing list;
4.
Immediately upon receiving the unit, it should be
JOHNSON CONTROLS
Cooke Industries - Phone: +64 9 579 2185
012
014
136
138
kg
126
128
kg
FIGURE 4 –HOISTING DIAGRAMMATIC DRAWING
control panels. Before servicing, open and tag all disconnect
Email: sales@cookeindustries.co.nz
FORM NO.: 6U5M-A11M-NB-EN
016/018
020/022/025
151
220
141
210
Schematic Diagram of Hoisting without Packaging
Insert under boarding or cloth
Without a wooden cork base
Center of gravity of the unit inclined to one
side, please hoisting according to the above
picture and the requirements of installation
manual. Please refer to the parameter list for
the weight of the unit.
inspected for possible damage which may have
occurred during transit. If damage is evident, it
should be noted in the carrier's freight bill. A
written request for inspection by the carrier's
agent should be made at once.

HANDLING

These units are shipped as completely assembled units
containing full operating charge, and care should be
taken to avoid damage due to rough handling.
Web: www.cookeindustries.co.nz
028/033
040
225
360
215
350
Location of
compressor
10