Mevb Installation Instructions; Power Supply - Mpfb Connection - Motorola M68MPBF333 User Manual

Mcu personality board
Table of Contents

Advertisement

Table 3-1. MPFB Quick Start Jumper Header Configuration (continued)
Jumper
Header
Type
W18
1 2 3
W19
1 2 3
W22
1 2 3

3.3 MEVB INSTALLATION INSTRUCTIONS

MEVB installation requires a user-supplied power supply and host computer. The
host computer must have a parallel port and must run MS-DOS, as required by
ICD32. The following paragraphs explain MPFB connections. Refer to Chapter 2
for instructions to connect the MPB and MPFB.
3.3.1
Power Supply – MPFB Connection
Use MPFB connector J5 (Figure 3-1) to connect a user-supplied power supply to
the MEVB. Contact 1 is ground; black lever. Contact 2 is VDD (+5 volts); red
lever. Use 20 or 22 AWG wire for power connections. For each wire, trim back
the insulation 1/4 in. (.635 cm), lift the appropriate lever of J5 to release tension
on the contacts, then insert the bare wire into J5 and close the lever. The MEVB
requires a +5Vdc @ 1.0 amp power supply for operation. A 1.5 amp fuse is
installed on the MPFB +5Vdc power supply input line.
M68MPB333UM/D
Install a jumper on pins 1 and 2 for unrestricted writes to the memory devices
in the pseudo ROM sockets (U2 & U4).
Install a jumper on pins 1 and 2 to ground the A19 signal to the MPFB memory
arrays.
Install a jumper on pins 1 and 2 to select the evaluation MCU (on the MPB) as
an M68300 MCU device.
MEVB QUICK START GUIDE
Description
3-3

Advertisement

Table of Contents
loading

Table of Contents