Ordering Parts; Recommended Spare Parts; Returning Parts; Predicted Life - Pentair Fairbanks Nijhuis 7100 19A Installation, Operation And Maintenance Manual

Vertical turbine pump
Table of Contents

Advertisement

19A, 19B 7100 & 21H 7000 Vertical Turbine Pumps

Ordering Parts

When ordering parts, give pump serial
number, size, model number, a complete
description, and item number of each part.
Refer to the drawings and parts list in
the
drawing
section
You may order parts from your local
Fairbanks Nijhuis™ distributor. Consult you
local telephone yellow pages under "Pumps"
for the office nearest you.
You may also contact Fairbanks Nijhuis
directly as follows:
Fairbanks Nijhuis
3601 Fairbanks Avenue
Kansas City, KS 66106
Phone (913) 371-5000
Fax (913) 748-4025

Recommended Spare Parts

Refer to Table 1 for a list of recommended
spare parts. This list is for normal duty.
Where severe conditions exist or minimum
down time is critical additional quantities and
those items indicated should be considered.
Table 1
Recommended Spare Parts
Item
Description
13
Sleeve, Top Drive Shaft
15
Packing, Set
17A
Bushing, Packing Box
26
Bearings, Line shaft, set
29
Sleeve, Line shaft, set
31
Couplings, Set
34
Bearing, Top Bowl
35
Bearing, Inter Bowl, set
41
Bearing, Suction
50
Bearing Connector, set
Gasket, Set

Returning Parts

All materials or parts returned to the factory
must have prior approval and a "Returned
Goods Tag", listing the material to be
returned and the reasons for the return. All
material to be returned should be carefully
packaged to avoid damage in route from
rough handling or exposure to weather.
09/03/13
of
this
manual.
Quantity
1
1
1
1
1
1
1
1
1
1
1
Contact the factory for shipping instructions.
All material is to be returned freight prepaid.
Fairbanks Nijhuis makes improvements on
its products from time to time and reserves
the right to furnish improved parts for
repairs. A part that is received and is not
identical in appearance, or has a different
symbol from the original part may be
interchangeable. Examine the part carefully
before contacting your Fairbanks Nijhuis
representative. The parts should never be
returned
to
the
obtaining proper authorization from your
Fairbanks Nijhuis Pump representative.

Predicted Life

The predicted life of parts subject to wear,
shown in Table 2, is based on pumping
liquid without abrasives, the pump operating
at
sold
conditions
maintenance is performed.
The actual life encountered for the specific
parts may vary significantly as a result of the
content of liquid pumped, maintenance
performed, actual operating conditions and
other factors.
factory
without
first
and
that
proper
Fairbanks Nijhuis™
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fairbanks nijhuis 7100 19bFairbanks nijhuis 7000 21h

Table of Contents