11.3 Operation Procedure after Installation

After installing the clock controller, follow the procedure below.
Start
Check that "GPS"
indicator is lighting up.
Time difference setting
Manual time setting
Secondary clock hand
position setting
Checking of secondary
clock hand position
Manual GNSS reception
End
* If it is not lighting, check if the GNSS receiver is connected
properly with the clock controller.
* If the voltage of the capacitor has reduced to 3.5 V or less,
"LCAP" and the current time is displayed alternately on the
time display, and the hands will not be adjusted after the
hand position is set. Once the capacitor is recharged, they
are adjusted automatically.
For details, refer to "11.7 Special Display."
* Check that the time display of the clock controller and the
hands of the secondary clock indicate the same time.
* The manual GNSS reception can be omitted. Even if it is not
performed, the GNSS receiver will start correcting the time
when the current time reaches 12:00 PM.
* If the voltage of the capacitor has reduced to 3.7 V or less,
"LCAP" and the current time is displayed alternately on the
time display, and the manual GNSS reception is disabled.
Once the capacitor is recharged, it will be enabled.
While the hands of the secondary clock are being adjusted,
"ADJ" is displayed on the time display for five seconds, and
the GNSS reception is disabled. Perform the manual GNSS
reception after the hand adjustment is completed.
For details, refer to "11.7 Special Display."