3D Systems DMP Flex 350 Original Instructions Manual page 40

Production printer
Hide thumbs Also See for DMP Flex 350:
Table of Contents

Advertisement

9.2 Facility Requirements Checklist - DMP Flex 350
You must complete and sign this form before scheduling installation. The information on this form will be used to
determine the necessary time that 3D Systems personnel will need to complete the installation. In case multiple
Contact name
Phone, email, fax
Facility address
Date submitted
Type of installation
Equipment and Packaging
Production Hall Requirements
Safety Requirements
Note: Checklist continues on the next page!
3D Systems, Inc.
IMPORTANT
printers are to be installed, use 1 checklist for each printer.
Phone
Email
Fax
Compact setup
Split setup
Storage requirements completed
Door to production hall checked
Electricity completed
Argon completed
Compressed air completed
Customer Supplied Equipment
Height checked, and gate for equipment checked
Workspace checked
Floor Specifications checked
Fire suppression equipment available
All Personal Protective Equipment available
Waste disposal system established (must comply with all
applicable regulations
Hand tools available
Emergency eyewash station available
36
Refer to chapter 3
Refer to chapter 4
Refer to chapter 5
p/n: 15-D99, rev. C

Advertisement

Table of Contents
loading

Table of Contents