Operation Checklist - GE JGSP42SETSS Installation Instructions Manual

30” gas self-clean slide-in range
Hide thumbs Also See for JGSP42SETSS:
Table of Contents

Advertisement

12  F INAL INSTALLATION CHECKLIST
•  C hecktomakesurethecircuitbreakerisclosed(RESET)orthecircuitfusesarereplaced.
•  B esurepowerisinservicetothebuilding.
•  C heckthatallpackingmaterialsandtapehavebeenremoved.Thiswillincludetapeonmetal
panelundercontrolknobs(ifapplicable),adhesivetape,wireties,cardboardandprotectiveplastic.
Failuretoremovethesematerialscouldresultindamagetotheapplianceoncetheappliancehas
beenturnedonandsurfaceshaveheated.
•  C heckthatthedooranddrawerareparalleltoeachotherandthatbothoperatesmoothly.Ifthey
donot,repeatsteps4and9.
•  C hecktomakesurethattherearlevelinglegisfullyinsertedintotheanti-tipbracketandthat
thebracketissecurelyinstalled.
OpErATION CHECKLIST
•  C heckthattheovencontroloperatesproperly.Iftheovencontroldoesnotoperateproperly,
recheckthewiringconnections.
•  B esureallrangecontrolsareintheOFFpositionbeforeleavingtherange.


Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jgsp42detwwJgsp42detbb

Table of Contents