Installation Room - ICI Caldaie REX F 7 Instructions For Installation, Use And Maintenance Manual

Pressurised steel boilers
Table of Contents

Advertisement

HANDLING
REX F
boilers are equipped with fittings for lifting operations and, in any case, they must be carefully moved with equipment
suitable for their dimensions and weights.
ATTENTION
a
The Personal Protective Equipment required by current legislation must be used.

INSTALLATION ROOM

The REX F boiler installation room must be for exclusive use, meet the Technical Standards and Legislation in force and equipped
with adequately sized ventilation openings.
The spaces around the boiler and towards the ceiling must be suitable for:
– installing the appliance
– reaching the safety devices
– maintenance
– repairing any breakage
– opening the door of the installed burner, considering its opening direction (towards the right or the left)
It is recommended to position the boiler, if possible, lifted from the floor to minimise dust extraction by the burner fan.
> 600 mm
(*) A ≥ P2 (see "Size and fittings*)
IMPORTANT
m
– The front space (A) must be greater than the boiler length to be able to extract the turbulators or replace a fire tube in
case of breakage.
– In the case of several boilers installed in the same room, check the accessibility to the most remote boiler to be able to
perform ordinary and extraordinary maintenance.
12
Cooke Industries - Phone: +64 9 579 2185 Email: sales@cookeindustries.co.nz Web: www.cookeindustries.co.nz
P2
A (*)
≥ 90°
NO!
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents