R&S ENV4200 User Manual page 17

Four line v-network
Table of Contents

Advertisement

®
R&S
ENV4200
4 Operating the R&S ENV4200
Before the R&S ENV4200 is put into operation, read the
Putting the R&S ENV4200 into operation
Execute the following steps in the order as described. Additional important information
is provided in separate chapters that are linked within each step. See also
"Safety
1. Place the R&S ENV4200 on a non-flammable surface and remove all surrounding
items that could obstruct the ventilation openings as described in
"Setting up the
2. Establish a protective ground connection of the R&S ENV4200. See
"Connecting to protective
tion"
3. Establish a reference ground connection of the R&S ENV4200. See
"Connecting to reference
4. Connect the equipment under test to the R&S ENV4200. See
necting the equipment under
5. Connect the test receiver to the R&S ENV4200. See
test
6. DANGER! Risk of fire. Do not operate the R&S ENV4200 without the auxiliary volt-
age since this voltage is necessary for operation of the fan system. Failure of the
fan system can lead to an overheating of the R&S ENV4200, burns if the housing
is touched and in extreme cases cause a fire.
To set up the auxiliary voltage supply:
a) Check if the voltage of the auxiliary AC supply corresponds to the selected AC
b) Connect the auxiliary AC voltage to the R&S ENV4200.
7. DANGER! Risk of electric shock. See
Connect the R&S ENV4200 to the mains supply. See
power",
8. Run the measurement. See
on page 22.
4.1 Connecting to protective ground
Connect the R&S ENV4200 to a ground conductor before you put it into operation. See
"Protective ground connection"
User Manual 1107.2470.12 ─ 04
instructions",
on page 3.
product",
on page 15.
ground",
on page 5.
ground",
receiver",
on page 19.
supply voltage of the R&S ENV4200. See
ary
voltage",
on page 20 for further details.
on page 21 and
"Connecting to power"
Connecting to protective ground
on page 17 and
on page 18.
test",
on page 19.
Chapter 4.5, "Connecting the auxili-
"Protective ground connection"
on page 5.
Chapter 4.7, "Example: Measurement
on page 5 for further information.
Operating the R&S ENV4200
Safety Instructions
carefully.
Chapter 1.1,
Chapter 3.4,
Chapter 4.1,
"Protective ground connec-
Chapter 4.2,
Chapter 4.3, "Con-
Chapter 4.4, "Connecting the
on page 5.
Chapter 4.6, "Connecting to
setup",
17

Advertisement

Table of Contents
loading

Table of Contents