Performing an SDT on one of the POTS or ISDN channel interrupts service on the line under test. The
remaining lines on the PG-Plus system remains in service.
Upon tests completion the SDT Results screen displays Subscriber Test, Failure Condition, and Test Status.
Tests are performed in the order of display. If a test fails, the remaining tests are not performed (as per
TR-909). It takes approximately seven to eight seconds for all tests to complete.
If you selected the POTS option, the following screen displays:
If you selected the ISDN option, the following screen displays:
5
Press
to move up a menu level, or
ESC
PLL-724 List 1
+
to return to the PAU/PMU Main menu.