3.6 Installing a PSU

3.6.1 Installation Preparation

Wear an ESD-preventive wrist strap and verify the ESD-preventive
wrist strap is properly grounded.
If there is a filler panel in the position where you will install a PSU,
remove the filler panel.
Caution:
When you move a PSU, hold its bottom with one hand. Do not move it by
just holding its handle. Otherwise, the PSU may be damaged.

3.6.2 Installation Procedure

I. Removing a PSU other than NEPS3500-A
The following procedure applies to all NEPS PSUs except NEPS3500-A.
(1)
(1)
(2)
(2)
(5)
(5)
(9)
(9)
(2) DC power input
(5) PDF
(8) PGND strip
(11) Grounding screw
(3)
(3)
(4)
(4)
(10)
(10)
3-9
Chapter 3 Installing the Switch
(3) NEG terminal
(6) -48V strip
(9) Earth ground