Advertisement

Quick Links

Certi ed
Certi ed
to CAN/BNQ
to BNQ
standard
standard
3680-600
NQ 3680-910
Owner's manual
Phosphorus removal

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the REWATEC Phosphorus removal unit and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for PREMIER TECH REWATEC Phosphorus removal unit

  • Page 1 Owner’s manual Phosphorus removal Certi ed Certi ed to CAN/BNQ to BNQ standard standard 3680-600 NQ 3680-910...
  • Page 3: Table Of Contents

    Phosphorus removal unit (DpEC) – Owner’s manual Congratulations on your purchase of a phosphorus removal unit (DpEC) from Premier Tech, which may be followed or not by a watertight sand filter. With the phosphorus removal unit (DpEC), you have wisely chosen to protect your health and your environment.
  • Page 4: Operating Principles

    The treatment systems designed by Premier Tech are a technological advancement based on phosphorus removal by electrocoagulation. This technology, specially developed to treat wastewater from onsite applications, may be installed upstream of a conventional wastewater system for the treatment of wastewater from isolated dwellings.
  • Page 5: Primary Reactor

    1.1. Primary reactor The untreated wastewater first makes its way from the dwelling to the primary reactor. The primary reactor plays the triple role of clarifying the wastewater by letting suspended solids settle to the bottom and retaining floating matter to prevent premature clogging of the system, regulating effluent flow discharged in the EC unit, serving as a holding tank for the returning sludge from the EC unit.
  • Page 6: Watertight Sand Filter

    The primary reactor model PRT-660 is designed to treat up to 1,440 L/d (up to 4 bedrooms). the primary reactor model PRT-960, composed of 2 tanks installed in series, is designed to treat up to 2,160 L/d (up to 6 bedrooms). The EC unit, model DpEC-090 can also treat up to 2,160 L/d (up to 6 bedrooms).
  • Page 7: Operating Guidelines

    Operating Guidelines 2.1. Types of wastewater that can be treated Wastewater Characteristics The treatment performance of the unit depends of the physicochemical raw wastewaters coming to the treatment chain. These should be typical and balanced in order to be compatible with biological treatment process and the maintenance of good treatment performance (i.e.: neutral alkalinity and lack of sufficient inhibitory substances).
  • Page 8: Owner's Responsibility

    By respecting these guidelines, you contribute to the proper operation of your septic system and help prolong the life of your phosphorus removal unit (DpEC). Failure to abide by these guidelines may, at Premier Tech's discretion, render the warranty invalid.
  • Page 9: About Your Home

    100 mm (4") or be connected to the air vent of the isolated dwelling being serviced. Premier Tech strongly recommends using a pipe with a diameter of 100 mm (4") for the air vent.
  • Page 10: Electrical Wiring

    4. Electrical Wiring All electrical connexions must be performed by a certified electrician and according to local regulation. Using seal connectors and junction boxes is mandatory. Use four (4) separate circuit-breakers, two to operate the control panel, one to connect the alarm box and the last one for TLP-FAS when required.
  • Page 11: Maintenance

    Premier Tech recommends that you contact a local Premier Tech service partner or a qualified third party as referred to in section 1x.2) of the Regulation respecting waste water disposal systems for isolated dwellings (Q-2, r.22) to perform the maintenance of your primary reactor.
  • Page 12: Ec Unit

    EC unit A local Premier Tech service partner or a qualified third party as referred to in section 1x.2) of the Regulation respecting waste water disposal systems for isolated dwellings (Q-2, r.22) will perform the maintenance of your EC unit. This visit has the double purpose of verifying that all the components are operational and if the consumable Aluminium Electrodes need to be replaced.
  • Page 13: Backflow

    The information contained in this document was up-to-date and consistent with the information available at the time of publication. Premier Tech Ltd. makes no warranties or representations as to its accuracy. Because of its continuous improvement policy, Premier Tech Ltd. and its affiliated companies reserve the right to change and/or discontinue the manufacture of any product and/or modify technical data and prices, for any reason whatsoever and at its sole discretion, without further notice and without liability to anyone in this regard.
  • Page 14: Certificat Of Warranty For The Phosphorus Removal Unit (Dpec)

    Failure to abide by the terms and conditions of Section 8 of this Certificate of Premier Tech or by a qualified third party as referred to in section 1x.2) of the Warranty may, at Premier Tech’s discretion, render it invalid or to be rejected.
  • Page 15 This warranty supersedes any contract or understanding, written or verbal, duly authorized representatives to carry out all necessary monitoring and entered into between the Customer and Premier Tech. In the event of a inspections, as required, for the implementation of this warranty.
  • Page 16: Annex 1 - Notice Of Change Of Property Ownership

    ____  Phone (other) ____  Email ________  I hereby declare that the residence serviced by a Premier Tech treatment system located at the above address changed ownership on this date If you are the PREVIOUS owner:  I have provided the system’s Owner’s Manual and the included Warranty Certificate* to the new owners. I have informed them that an annual maintenance is required on the system as per local regulation and to maintain the validity of the product’s warranties.

Table of Contents