Necessary Tools; Transportation And Handling; Transportation; Handling - Hitachi RPK-0.8HNBUSQ Manual

Table of Contents

Advertisement

3. Necessary Tools

Necessary Tools and Instrument List for Installation
Please use tools or devices exclusively for R410A when contacting with R410A is inevitable.
Do not mix with other refrigerants.

4. Transportation and Handling

4.1 Transportation

Transport the product as close to the installation location
as practical before unpacking.
Do not put any materials on the product.

4.2 Handling

Do not put any foreign matters into the indoor unit and
check to ensure that none exists in the indoor unit before
installation and test run. Otherwise, it may lead to a fire or
failure, etc.
Be careful not to damage on insulation materials on unit
surface when lifting.
No.
Tool
1 Handsaw
2 Screwdriver
3 Vacuum Pump
4 Refrigerant Gas Hose
5 Megohmmeter
6 Copper Pipe Bender
7 Manual Water Pump
8 Pipe Cutter
9 Brazing Kit
10 Hexagon Wrench
No.
Tool
11
Spanner
12
Charging Cylinder
13
Gauge Manifold
14
Cutter for Wires
15
Gas Leak Detector
16
Spirit level
Clamper for Solderless
17
Terminals
18
Hoist(for Indoor Unit)
19
Ammeter
20
Voltage Meter
NOTE

5. Precautions during Installation

Do not install the indoor unit in a flammable environment to
avoid a fire or explosion.
● Check to ensure that the ceiling slab is strong enough.
Otherwise, the indoor unit may fall down.
● Do not install the indoor unit outdoors. Otherwise, an
electric hazard or electric leakage will occur.
It is recommended that indoor units be installed at least
2.5 meters above the floor level.
● Please make sure the accessories are shipped along
with the indoor unit. If not, please contact the distributer.
3
Necessary Tools

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents