Gas Conversion - KBS NGWT 7-55/SN Installation, Operation And Maintenance Instructions

Gas wok ring table
Table of Contents

Advertisement

Only professional and qualified mechanic can do this job.
1.
By looking "Adjustment", replace Main Burner Injectors, Pilot Burner Injectors, and adjust correctly Primary Air
Setting for each Main Burner.
2.
Spare injectors are available with the appliance.
3.
Make sure the diameter printed on each injector in 1/100 of a millimeter.
4.
Convert the appliance after turn the gas OFF and in UP position and let Gas Wok Ring Table cool.
Important! On completion of the operation, make sure that there are no gas leaks or malfunctions

5.1 Gas Conversion

5.1.1 Main Burner Nozzle
1. Lift the Burner (1) about 10 mm and pull from mixing chamber (3)
2. Remove the fixing screw (2). This screw can be reach from below.
3. Remove the complete mixing chamber (3) by turn anticlockwise from the Nozzle.
4. Turn the pressure ring (4) from Nozzle. DO NOT lose the pressure ring.
5. Remove the screw (5) and take the complete Nozzle unit.
6. Remove the Nozzle from the Nozzle carrier and replace with the new one that suit to the table depend to
the country and gas type.
7. Fix the Nozzle with a non-hardening sealing tape.
8. Replace the burner by following instructions to opposite direction. Notice the Primary Air Adjustment.
1
2
3
4
5
Fig. 5
Amicus- Gas-20190620
5. Gas Conversion
19
GB-Gas Wok Ring Table

Advertisement

Table of Contents
loading

Table of Contents