Mercia Garden Products 01OVLPA1208DDFW-V1 General Instructions Manual

12x8 overlap apex shed

Advertisement

Quick Links

General Instructions
01OVLPA1208DDFW-V1 & 01OVLPA1208DDFW-V1-NW
12X8 OVERLAP APEX SHED
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be a ected during various weather conditions. For the duration of
heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also
occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be
avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended
periods of warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guaran-
tee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The
cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst
erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 01OVLPA1208DDFW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01OVLPA1208DDFW-V1

  • Page 1 All building’s should be Winter = High Moisture = Expansion Summer = Low Moisture = Contraction erected by two adults 01OVLPA1208DDFW-V1 & 01OVLPA1208DDFW-V1-NW 12X8 OVERLAP APEX SHED BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY CAUTION For ease of assembly, you...
  • Page 2 01OVLPA1208DDFW-V1 & 01OVLPA1208DDFW-V1-NW Please retain product label and instructions for future reference Overall Dimensions: Length = 3574mm Nail Bag Width = 2484mm Felt Tacks x 142 01OVLPA1208DDFW-V1 40mm Screw x 130 Height = 2121mm 30mm Screw x 92 Base Dimensions:...
  • Page 3 Step 1 Step 3 for no window buildings Fix the remaining plain side and Place oor on rm and level base, ensure a window side at the corners base has suitable drainage free from areas with 50mm screws as shown in where water can collect.
  • Page 4 Step 5 Step 7 i) Fix the truss block to the side Ridge Bar Assembly panel framing with 2 x 50mm screws. Position the block at the Position the two parts of the ridge top of the framing with the bar within the ‘U’...
  • Page 5 Step 11 Step 9 Place two roof sheets ontop of the Do not secure the plain gable and truss making sure building to the oor the roof sheet sits ush to the until the roof is tted. outside edge of the plain gable Fix the panels onto and x using 40mm screws.
  • Page 6 Step 12 Step 13 Cut out three strips of Fit the cover trims to the 3740mm felt and place building and secure in place onto the roof. with 40mm screws as shown. Place the felt at onto the Pre drill to avoid splitting. roof in the order that is 18x40mm Screws stated on the diagram...
  • Page 7 Step 15 Step 16 Use 4x30mm Screws to x Attatch the turn button to First line up the door blocks each beading strip onto the on top of the framing of the the top and bottom door 30mm door gable. Ensure that the blocks with 1x30mm screw doors.
  • Page 8 Step 17 Fix the door strips to the master door using 5x30mm screws. 30mm If the strips are attatched to screw the slave door the doors will not open properly. Pre drill 5x30mm Screws hole 30mm It is ESSENTIAL that you apply wood Use 1x30mm screw to screw treatment immediately after the building...

This manual is also suitable for:

01ovlpa1208ddfw-v1-nw

Table of Contents