Download Print this page

Mercia Garden Products 01OVLPA0806SDFW-V2 Manual

8x6 overlap apex

Advertisement

Quick Links

General Instructions
BUILDING CODE
8X6 OVERLAP APEX
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for
maintenance, annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree
causing damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of
heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur
during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided
but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The
cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least
25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting
or using this product.
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
PLEASE SCAN HERE:

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01OVLPA0806SDFW-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01OVLPA0806SDFW-V2

  • Page 1 25mm above the surrounding ground level to avoid ooding. For assistance please contact customer care on: 01636 880514 TYPES OF BASE Mercia Garden Products Limited, - Concrete 75mm laid on top of 75mm hard-core. Sutton On Trent, - Slabs laid on 50mm of sharp sand.
  • Page 2 01OVLPA0806SDFW-V2 & 01OVLPA0806SDNW-V3 Please retain product label and instructions for future reference Overall Dimensions: Fascia 7x60x1016mm QTY 4 OVLPR60-1016mm Length = 2414mm Width = 1905mm 01OVLPA0806SDFW-V2 Fixed Window Strip 12x30x546mm QTY 5 (FW ONLY) Height = 1986mm S1230-546mm Base Dimensions:...
  • Page 3: Pre-Assembly

    Step 1 Pre Assembly Remove transportation blocks Place the oor on a rm and level base, from the bottom of each panel ensure the base has suitable drainage free before beginning assembly. from areas where standing water can collect. Each Panel should have two See the front page for base requirments.
  • Page 4 Step 3 Step 5 Fix two eaves frames to each roof Fix the corners with 50mm screws sheet using 3x30mm screws per eave. as shown in diagram. 9x50mm Screws Fix the roof sheets to the roof ensuring they come together at the top using 40mm screws directly through the 50mm Pre drill...
  • Page 5 Step 8 Step 7 Fit the Cover Trims to the front and back of the building as shown in Cut the felt into 2 sheets at 2514mm and x onto the roof illustration using 30mm using felt tacks as shown in diagram ensuring there is screws.
  • Page 6 Step 10 Step 11 For the no window version go to step 11 Use 4x30mm Screws to x each beading Fix the window strips to the two pieces of strip onto the door gable. Ensure that the framing that sit alongside the outside screw is parallel with the door frame when edges of the window with 3x30mm screws xing the strip to the door gable as shown...
  • Page 7 Step 12 Use 1x30mm screw to x the turn buttons onto the Door Gable 2x30mm Screws 30mm screw It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...
  • Page 9 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...

This manual is also suitable for:

01ovlpa0806sdnw-v3