5.2 - Product Installation & Set-up (continued)
d. Insert the tower assembly into the installed base assembly, rotate by
hand to align the pin holes, then lock the tower in place with the Tower
Securing Pin
e. Adjust the levelling pegs in order to place the tower in a vertical posi-
tion (Refer to Fig. 5n). ! WARNING ! - The #FT-C70 fall arrest tower
can only be used for the anchoring of personal fall arrest systems when
placed in a vertical orientation. Check that all adjustments and fasteners
are secure, then utilize the #FT-C70 Fall Arrest Tower according to its
Product Manual (Refer to document #500714-001).
Figure #5n:
Tower #FT-C70 Installation Step "e"
501169-001 - Product Manual - AC-R Series Anchor Clamp - Revision 00 - 2012-05-01
!WARNING! - The FT-C70 Fall Arrest Tower uti-
lized in conjunction with an AC-R Series Anchor
Clamp must be installed according to its product
manual, and utilized by a qualifi ed individual in
order to retain its stated rating & compliance.
Figure #5m:
Tower #FT-C70
Installation Step "d"
!WARNING! - Any FT-C70 Fall Arrest Tower
Attached to an AC-R Series Anchor Clamp
must be utilized within its published limits and
capabilities. The rating of the installed tower
may supersede or derate the capabilities of
the AC-R Series Clamp.
Page 17