Pelsue AC-R Series Product Manual page 16

Anchor clamps for round manways provides fall arrest tower mounting]
Table of Contents

Advertisement

5.2 - Product Installation & Set-up (continued)
e. Turn the 4X Flange Thickness adjustment knobs clockwise to bring the jaw
plates into contact with the bottom face of the manway fl ange. Using only
hand strength tighten the four knobs as much as possible to complete instal-
lation of the AC-R Series clamp. Check all adjustment points and ensure
that the clamp is securely and properly installed before proceeding. It should
not be possible to move the clamp without loosening the adjustments when
the clamp is properly installed.
!WARNING! - The user
must ensure that the AC-R
Series Clamp is properly
installed & securely clamped
on the selected structure
before attaching any life-
line or additional fall arrest
system components.
3. Installation of an #FT-C70 Fall Arrest Tower on the AC-R Series Anchor Clamp:
a. Install the AC-R Series Anchor Clamp according to the instructions in Step #2 of section 5.2 of this manual.
b. Separate the #FT-C70 tower into its
two major components (i.e. the Base
Assembly, and the Tower Assembly)
c. Center the tower base assembly over
the tower mounting ears, placing the
pin holes "in-line". Visually align the
pin holes and insert the base secur-
ing pin completely through each ear
and the tower base. The screw pegs
may have to be adjusted on the base
in order to allow alignment.
Page 16
Figure #5k:
Tower #FT-C70
Installation Step "c"
501169-001 - Product Manual - AC-R Series Anchor Clamp - Revision 00 - 2012-05-01
Figure #5j:
Installation Step "e"

Advertisement

Table of Contents
loading

Related Products for Pelsue AC-R Series

This manual is also suitable for:

501169-001

Table of Contents