Download Print this page

GE Arize Element L1000 Gen2 Manual page 7

Horticulture led lighting system

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 27
®
Arize Element
L1000 Gen2
Installation Steps for Perpendicular 90° Universal Mounting Kit
First determine which 2 slots on
1
the metal bracket most closely
correspond to the structural
member width. Insert strap of
the worm drive clamp through
the first slot of the metal
bracket from the top.
Attach a carabiner to each
4
side of the metal bracket.
1.6 Installation with Custom Brackets
Place the metal bracket on
2
top of the structural member
and wrap the strap around
the bottom of the structural
member and back up through
the second slot.
Attach a support cable to each
5
carabiner and ensure the gates
are closed.
A
A
3
6
If you choose to use your own
custom mounting method, attach
to points A.
7
Installation Guide
Secure the metal bracket on
to the top of the structural
member by inserting the
strap into the open end of the
clamp and tightening down
the screw.
Attach other end of cables
to light module. Ensure hook
gates are closed.

Advertisement

loading