  • Page 1 Solera 5000 ® Series Awning OEM INSTALLATION MANUAL...
  • Page 2: Table Of Contents

    Seal Wall Penetrations Introduction The Solera 5000 Series Awning features an easy access for manual overdrive and internal motor to steadily operate the awning. Additionally, the pitch arm assembly allows for rain dump and adjustable pitch features. The pitch arm assembly also provides added stability.
  • Page 3: Prior To Installation

    Prior to Installation All screws supporting the Solera 5000 Series Awning assembly must have a backer within the structure of the wall of the unit. Refer to the unit's manufacturer for proper location. Resources Required • 2 - 3 People, depending on task •...
  • Page 4: Awning Installation

    Awning Installation On the awning rail, mark the position of the centerlines of the support arm assemblies. Make sure that the support arm assemblies will not interfere with any lights, vents or other obstructions. Using a non-permanent method of marking, mark a perpendicular line from the awning rail down to the floor line.
  • Page 5 Use a screwdriver to spread open either end of the awning rail channel (Fig. 4A). To protect the fabric from damage during installation, file any sharp edges or burrs from the awning rail channel (Fig. 4B). Use silicone lubricant and spray the inside of the awning rail channel (Fig. 4B). Fig.
  • Page 6: Securing The Fabric

    Fabric Stitching Awning Wiring The Solera 5000 Series Awning motors come stock with an internal 6A auto reset breaker. If this breaker trips, it will take approximately 30 seconds to reset. Lippert recommends the awning be wired into a 15A circuit breaker.
  • Page 7: Wiring Diagram

    Wiring Diagram *Wire colors may vary depending on what switch is used. Wire colors shown reference using a Lippert Rocker Switch. Fig. 9 Power 15A Circuit Breaker per RVIA Code (OEM Supplied) Ground Manual Black Battery, Rocker Power Source Switch...
  • Page 8: Installation With Led - Options

    Installation with LED — Options LED Light Rail Installation Note: Solera 5000 Series Awning must be installed prior to LED Light Rail installation. Seal the back of the LED light rail with silicone sealant or tape. Mount the LED light rail (Fig. 11B) directly below the awning rail (Fig. 11A) and secure to the side of the unit.
  • Page 9: Seal Wall Penetrations

    Note: Make sure the screw does not completely go through the polycord and into the awning fabric. Make sure that the LED light strip is hanging straight, parallel to the ground. Fig. 13 Depending on top wire or bottom wire installation, remove the wire covers in the drive side mount arm. If bottom installation, take the LED light strip power wire (Fig.
  • Page 10 The contents of this manual are proprietary and copyright protected by Lippert Components, Inc. (LCI). LCI prohibits the copying or dissemination of portions of this manual unless prior written consent from an authorized LCI representative has been provided.  Any unauthorized use shall void any applicable warranty. ...