Shutdown; Disposal Of Old Equipment; Device Revision - UGSI Chemical Feed Encore MB Operation & Maintenance Manual

Diaphragm dosing pump
Table of Contents

Advertisement

Diaphragm Dosing Pump Encore
®

10. Shutdown

Before starting any maintenance or before long downtimes, drain the chemical from the dosing pump and rinse it thoroughly with a neutral medium.
CAUTION!
Excess chemical must be disposed properly. Follow the applicable accident prevention regulations, and wear personal protective equipment.
Protective clothing
CAUTION!
The dosing pump must be disconnected from the power supply and secured to prevent it being restarted.
CAUTION!
Before disconnecting the discharge line from the pump discharge valve, release the pressure so that chemical does not spray out.
To drain the dosing head, it is advisable to unscrew the discharge and suction valves.

10.1 Disposal of old equipment

If the equipment is being disposed of, it should be washed thoroughly. Residual chemicals should be disposed of properly. The equipment was manufactured in
accordance with the ROHS guideline and the waste electrical equipment legislation. The manufacturer will take care of disposal if the equipment is returned free
of charge. It should not be disposed of as domestic waste!

Device revision

This operation manual applies to following devices:
Device
®
Encore
ME
®
Encore
MB
It contains all the technical information required for installation, start-up and maintenance. Should you have any questions or require further information regarding
this operataion manual, please contact the manufacturer or their official national representative.
CF.450.410.001.IM.1114
MB/ME
Protective gloves
Protective goggles
Revision
8/2001
8/2001
Operating Instructions
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Encore me

Table of Contents