Removal And Replacement Of By-Pass Valve-F-2000M#Fseries [Except F-2000Mlf] Only; F-2000M#F Series [Except F-2000Mlf] Only - Hoshizaki F-2000MLF Service Manual

Modular flaker
Hide thumbs Also See for F-2000MLF:
Table of Contents

Advertisement

14. REMOVAL AND REPLACEMENT OF BY-PASS VALVE-F-2000M#F
SERIES [EXCEPT F-2000MLF] ONLY
Always use a capillary tube of the same diameter and length when replacing
the by-pass lines; otherwise the performance may be reduced.
Always install a new Drier every time the sealed refrigeration system is
opened. Do not replace the Drier untill after all other repair, or replacements
have been made.
1) Turn off the power supply.
2) Remove the Front Panel.
3) Recover the refrigerant and store it in an approved container.
4) Remove the screw and the Solenoid.
5) Disconnect the By-pass Valve using brazing equipment.
6) Install the new valve.
Alwaye protect the valve body by using a damp cloth to prevent the valve
from overheating. Do not braze the valve body exceeding 250°F.
7) Install the new Drier.
8) Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.
9) Evacuate the system, and charge it with refrigerant. For the water-cooled models, see
the Nameplate for the required refrigerant charge and type. For the remote air-cooled
models, see the label on the Control Box.
10) Cut the leads of the Solenoid allowing enough lead length to reconnect using closed
end connectors.
CAUTION
IMPORTANT
CAUTION
74

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents