Preface; Document Organization - Cisco CRS-1 Site Planning Manual

Carrier routing system 8-slot line card chassis
Hide thumbs Also See for CRS-1:
Table of Contents

Advertisement

Preface

This site planning guide describes how to plan and prepare your site facilities for the installation of a
Cisco CRS Carrier Routing System 8-Slot Line Card Chassis (also referred to in this document as the
"Cisco CRS 8-slot LCC"). The guide provides a brief description of the chassis and its components, and
basic site facilities requirements.
This guide describes all power, cooling, and environmental specifications to consider before ordering
and installing the Cisco CRS 8-slot LCC. This guide also describes site facilities requirements, such as
floor space, weight requirements, receiving and staging, and installation information to help you plan
the site where the routing system will be installed.
The installation of a Cisco CRS 8-slot LCC may require space, floor loading, power, and cooling
Note
modifications to a facility; therefore, you should plan the site well in advance of the scheduled delivery
of the system.
Audience
This guide is for customers who must plan the facilities for the site where the 8-slot LCC is to be
installed. It should be used with Cisco Systems site planning coordinators and site inspections, well in
advance of the delivery of the routing system.

Document Organization

This guide contains the following chapters and appendixes:
OL-5802-09
Chapter 1, "Cisco CRS Carrier Routing System,"
main components.
Chapter 2, "Power and Cooling,"
and describes the power and grounding requirements for the routing system.
Chapter 3, "Technical and Environmental Specifications,"
specifications.
Chapter 4, "Site Planning Considerations,"
before you receive and install the routing system.
Appendix A, "Preliminary Site Survey,"
Appendix B, "Product IDs for the Cisco CRS 8-Slot Line Card Chassis,"
how to order the Cisco CRS 8-Slot LCC components.
Cisco CRS Carrier Routing System 8-Slot Line Card Chassis Site Planning Guide
provides an overview of the routing system and its
provides an overview of the chassis power and cooling systems,
provides technical and environmental
describes the site facilities requirements to plan for
provides checklists for the site preparation process.
provides information about