Operation - ABB PowerValue 11T IN User Manual

Hide thumbs Also See for PowerValue 11T IN:
Table of Contents

Advertisement

16
POWERVALUE 11T IN — 1-3 KVA
Step 1: External battery connection
Follow the right chart to make external battery
connection.
3.4.1-3
External battery connection
Step 2: UPS input connection
Plug the UPS into a two-pole, three-wire,
grounded receptacle only. Avoid using extension
cords.
For 200/208/220/230/240VAC models:
The power cord is supplied in the UPS
package.
For 100/110/115/120/127VAC models:
The power cord is attached to the UPS. The
input plug is a NEMA 5-15P for 1K and 1.5K
models, NEMA 5-20P for 2K model and
NEMA 5-30P for 3K model.
NOTE!
The recommended protection value as following:
For 200/208/220/230/240VAC models:
10A for the 1K and 1.5K models, 16A for the
2K and 3K models.
For 100/110/115/120/127VAC models:
15A for the 1K and 1.5K models, 20A for
2K model and 30A for 3K model.
-
+
Check if the site wiring fault
indicator lights up in LCD panel.
It will be illuminated when the UPS
is plugged into an improperly wired
utility power outlet (refer to
troubleshooting section). Please
also check if there is a circuit
breaker against overcurrent and
short-circuit between the mains
and AC input of the UPS for safety

operation.

Step 3: UPS output connection
There two kinds of outputs: programmable
outlets and general outlets.
Please connect non-critical devices to the
programmable outlets and critical devices to the
general outlets. During power failure, you may
extend the backup time to critical devices by
setting shorter backup time for non-critical
devices.
Step 4: Network connection
Network/Fax/Phone surge port
3.4.1-4
Network/Fax/ Phone surge port
Connect a single modem/phone/fax line into
surge-protected "IN" outlet on the back panel of
the UPS unit. Connect from "OUT" outlet to the
equipment with another modem/fax/phone line
cable.
Step 5: Turn on the UPS
Press the ON/Mute button on the front panel for
two seconds to power on the UPS.
NOTE!
The battery charges fully during the
first five hours of normal operation.
Do not expect full battery run
capability during this initial charge
period.

Advertisement

Table of Contents
loading

Table of Contents