4. Assemble needle valve
shaft L and spring R, and tighten screw P.
(Fit the e pansion washer). See figure 40.
5. Check using a ruler or the like that the lever is
level with the assembly plane on the cover.
If necessary, the lever arm can be bent, see
figure 41.
7. Fit gasket , the control membrane
pump cover . See figure 42.
8. Carry out a pressure test.
with lever arm
,
and the
Fig 40
Fig 41
Fig 42
Repair Instructions
H
J
K
41
English -