Download Print this page

Elo TouchSystems E421325 ELO-STAND-SELF-SERVICE-15-22-FLOOR-TOP4 Assembly Instructions Manual page 9

Advertisement

10
Android Slate: Landscape
(For Portrait, skip to step 12)
Note: EMV Cradles are not compatible with Android Slate
in landscape orientation.
Top Landscape
• Add (2) screws from bag "L" to top 75mm VESA
positions. Leave ~3mm (1/8") gap for mounting to
display bracket.
• Connect Slate Hub to Slate and attach cable cover
before proceeding.
11
Add tie-wrap
Route
Slate Hub
through display bracket and head. Mount Slate, add (2)
screws from bag "L" to bottom 75mm VESA positions. Add tie-wrap as
shown. Tighten VESA screws to 12 in-lb (1.4 N-m).
14
Skip to step
© Copyright 2021 Elo Touch Solutions, Inc.
9

Advertisement

loading

This manual is also suitable for:

E797162 elo-stand-self-service-15-22-floor-base