Download Print this page

Elo TouchSystems Z20 Assembly Instructions Manual

Pos stand

Advertisement

Quick Links

Assembly Instructions
Z20 POS Stand
Revision B
P/N E217972

Advertisement

loading

Summary of Contents for Elo TouchSystems Z20

  • Page 1 Assembly Instructions Z20 POS Stand Revision B P/N E217972...
  • Page 2 Box Contents Stand VESA Cover, Top, 10" qty 1 qty 1 Screw Height Tool qty 1 Base Plate qty 1 M4x10 Phillips Flat Head Screw qty 8, Bag A VESA Cover, Bottom, 15" M4x6 Phillips Pan Head Screw qty 1 qty 2, Bag B USB-C Cable qty 1...
  • Page 3 Step 1: If attaching stand to counter using screw-down method, remove 4 screws to disassemble weighted plate. Reinstall 4 screws back into stand. Step 2: Install 2 screws from bag A into I-Series as shown, using 2 top holes in 75mm VESA pattern. Do not tighten screws fully.
  • Page 4 Step 3: Remove I-Series cable doors. Assemble I-Series to stand as shown, sliding 2 screws from step 2 into upper slotted holes on stand VESA bracket. Tighten screws. Install 2 screws from bag A into lower holes on stand VESA bracket. All VESA screws to be tightened to 12 in-lb (1.4 N-m). Bag A Screws Step 4: Connect power and USB-C cables from stand to I-Series.
  • Page 5 Step 5: Assemble top VESA cover by sliding down onto stand VESA bracket. Use VESA covers corresponding to the I-Series size you are installing (10” or 15”). Step 6: Flip I-series over by rotating stand hinge. Assemble bottom VESA cover by sliding down onto stand VESA bracket.
  • Page 6 Step 7: Secure using screw provided with VESA covers. Step 8: Remove center screw securing top of door. Tilt open door by grabbing tab at top of door.
  • Page 7 Step 9: If adding a customer-facing display (CFD), remove screw securing front cover. Otherwise skip to step 15. Step 10: Slide front cover up and remove.
  • Page 8 Step 11: Install 2 screws from bag A into left holes of CFD as shown (75mm VESA pattern). Use screw height tool to set screw height. Tighten screws down until screws just touch screw height tool, then remove tool. Step 12: Remove CFD cable doors. Connect USB-C cable (included with stand) to CFD. Attach CFD cable clamps.
  • Page 9 Step 13: Feed other end of USB-C cable through cable hole in stand. Assemble CFD onto stand, aligning 2 screws from step 11 with keyholes in stand. Once screws are engaged with keyholes, slide CFD as shown until seated. Cable hole Step 14: Install 2 screws from bag A into remaining 2 VESA holes in CFD.
  • Page 10 Step 15: Connect stand power supply, LAN, and external peripherals to stand, routing cables through hole in bottom of stand. Step 16: Secure cables to cable retainer using cable tie. If screwing down to counter, proceed to step 17. If not screwing down to counter, reinstall door and door screw from step 8.
  • Page 11 Step 17: Screw base plate to countertop (4 places). Base plate Step 18: Drop stand onto base plate so screws in bottom of stand (from step 1) align with keyholes in base plate. Slide stand back to engage screws fully into keyholes.
  • Page 12 Step 19: Add screw from bag B to secure stand to base plate. Reinstall door and screw from step 7. Product assembly is complete and ready to use. Learn more about Elo at EloTouch.com. Americas Europe (EMEA) Asia Pacific Tel +1 408 597 8000 Tel +32 16 930 136 Tel +86 (21) 3329 1385 EloSales.NA@elotouch.com...