5.10 Installation: PV input port connections
1.
Connect the DC cables from the PV module(s)to the PV input port(s) of the microinverter.
D350-M1
6 Energizing the system
1
Turn on the AC breaker of the branch circuit.
2
Turn on the main AC breaker of the house. Your system will start to generate power after the regulated grid timing
sequence has completed.
6.1 Setting up the monitoring system
Refer to the DTU User Manual or DTU Quick Install Guide, and Quick Installation Guide for Online Registration to install the
DTU and set up the monitoring system. Product information is subject to change without notice.
Download reference manuals at www.duracellpowercenter.com
Installation Manual
D1500-M4
D700-M2
12