C. Place the plasma panel section on the servicing stand.
D. Attach the front frame and the each P.C.Board and so on, to the
new plasma panel.
* When fitting the front frame, be careful not to allow any debris,
dust or handling residues to remain between the front glass
and plasma panel.
7. Location of Lead Wiring
7.1. Lead of Wiring (1)
7.2. Lead of wiring (2)
21