3.
Install the sheave assembly to the spindle using
the washer and top nut
Figure 9
1. Top nut
2. Washer
4.
Torque the top nut to 176 to 217 N∙m (130 to
160 ft-lb).
Note:
Ensure that the sheave spins freely.
(Figure
9).
g313933
3. Sheave assembly
4. Spindle
5.
Align the new pulley assembly so that the
openings fit over the studs
6.
Turn the pulley to lock it into position
7.
After the new pulley assembly is in position,
install the nuts to secure the new pulley
assembly
(Figure
Torque the 3 nuts to 28 to 34 N∙m (21 to 25 ft-lb).
1. Pulley assembly
2. Nut
8.
Install the deck belt.
7
(Figure
10).
(Figure
10).
Figure 10
3. Stud
10).
g313932