Radiator Fill And Servicing - Manitowoc GROVE GRT8100 Service Manual

Hide thumbs Also See for GROVE GRT8100:
Table of Contents

Advertisement

POWER TRAIN
10. Tighten the drain cock at the bottom of the radiator.
11. Mount the surge tank to the frame using the two bolts,
washers, lockwashers and nuts.
12. Connect the hose between the surge tank and the
radiator and the hose from the engine to the surge tank.
Tighten clamps to 5.7 Nm (50 in-lb).
13. Fill the engine coolant system, refer to Engine
Antifreeze/Coolant Fill Procedure, page 7-17. Start the
engine, operate all systems and check for leaks.
14. Install the hood assembly.
15. Install the bolts and nuts holding the rear engine hood
panel to the engine hood.
16. Install the hood top door assembly.

Radiator Fill and Servicing

Refer to Lubrication, page 9-1 for complete fill and service
procedures.
7-20
2
1
Published 3/26/2018, Control # 596-05
GRT8100 SERVICE MANUAL
1
Engine Coolant Radiator
2
CAC Assembly
8804-110
FIGURE 7-15

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GROVE GRT8100 and is the answer not in the manual?

Table of Contents

Save PDF