Fronius Symo Advanced 10.0-3 208-240 Operating Instructions Manual page 30

Inverter for grid-connected photo-voltaic systems
Table of Contents

Advertisement

Available languages

Available languages

Maximum solar voltage (V)
maximum solar module voltage measured during the observation period.
After pressing the Enter key
the voltage values for MPP Tracker 1 and MPP Tracker
2 (MPPT1/MPPT2) are displayed, if MPP Tracker 2 is activated (see 'The Basic menu' -
'The Basic menu entries')
Operating Hours
indicates how long the inverter has been operating (HH:MM).
IMPORTANT! The time must be set correctly for day and year values to be displayed
properly.
30

Advertisement

Table of Contents
loading

Table of Contents